Home City Of Deerfield Beach Deerfield Beach Bridge Repairs Begin Monday

Deerfield Beach Bridge Repairs Begin Monday

229
0

Deerfield-News.com-Deerfield Beach,Fl-

SE 15 Avenue Bridge Repairs
Beginning Monday, April 22, the City’s Contractor, FG Construction LLC, will begin repairs to the SE 15 Avenue Bridge. Workers will replace the damaged parapet wall, as well as the guardrail along the bridge’s incline. No additional impacts to traffic are anticipated beyond the existing road closures. The bridge was shut down after it was damaged in December 2018. No additional impacts to traffic are anticipated beyond existing road closures currently in place, however, the canal will not be navigable during construction due to erosion and sediment control barriers that are required to be maintained in place for the duration of the activity. The bridge is closed to pedestrian/bicycle traffic, and violations will be enforced. The project duration is anticipated over the next three weeks, weather permitting. Please use caution when driving through this area and be sure to mind the detours. The City would like to thank residents and visitors for their patience and cooperation.

For more information on this project, please contact Environmental Services at 954.480-4400.